# Unclear how to recognize if I'm capturing too large of a scope

**URL:** <https://forum.johnnydecimal.com/t/unclear-how-to-recognize-if-im-capturing-too-large-of-a-scope/1582>\
**Category:** Concepts\
**Created:** [June 16, 2024, 1:33pm UTC](https://forum.johnnydecimal.com/t/unclear-how-to-recognize-if-im-capturing-too-large-of-a-scope/1582 "2024-06-16T13:33:06Z")\
**Posts on this page:** 5\
**Page:** 1

<div class="post-metadata">

**Author:** ![Mach3Maelstrom](https://forum.johnnydecimal.com/letter_avatar_proxy/v4/letter/m/ac91a4/32.png) [@Mach3Maelstrom](https://forum.johnnydecimal.com/u/Mach3Maelstrom)\
**Post date:** [June 16, 2024, 1:33pm UTC](https://forum.johnnydecimal.com/t/unclear-how-to-recognize-if-im-capturing-too-large-of-a-scope/1582/1 "2024-06-16T13:33:06Z")

</div>

I’m in a position where I can re-organize my company’s entire file structure. If I had my way, I’d want to create ONE company-wide system for all departments to use.

We are a small company with two development contracts, in addition to us commercializing 2 new product lines in the next 3 years.

While the workbook gives examples of how large a system should be, e.g. “build a farm”, not “remodel a kitchen”, there’s no clear guidelines to check myself if what I’m trying to do requires 1 or more systems.

How do I determine if my scope statement is too large for a single system?

---

<div class="post-metadata">

**Author:** ![dylanjr](https://forum.johnnydecimal.com/letter_avatar_proxy/v4/letter/d/278dde/32.png) [@dylanjr](https://forum.johnnydecimal.com/u/dylanjr)\
**Post date:** [June 16, 2024, 6:08pm UTC](https://forum.johnnydecimal.com/t/unclear-how-to-recognize-if-im-capturing-too-large-of-a-scope/1582/2 "2024-06-16T18:08:52Z")

</div>

> [@Mach3Maelstrom](#):
>
> If I had my way, I’d want to create ONE company-wide system for all departments to use.

I think your instinct to create a single system is right. On the website, [Johnny cautions against using multiple systems](https://johnnydecimal.com/10-19-concepts/13-multiple-systems/13.01-introduction/#a-word-of-caution):

> "I ran a three-year data centre migration for a large government department using a single system.

and

> " **You should only use multiple systems if they are absolutely required.**

I’ve never managed anything at the scale of you or Johnny, but it seems to me like you should try to commit to a single system and expand to multiple only if necessary. I think the need for multiple systems will present itself to individuals (or organizations) that require it.

Also, some advice I found here that was really helpful was to just start with the IDs. And make sure what you are calling IDs are actually IDs. I struggled with all this early on, trying to design my systems, areas, and categories too early, before I nailed down what my IDs really were. I can expound on any of this if its beneficial.

---

<div class="post-metadata">

**Author:** ![johnnydecimal](https://forum.johnnydecimal.com/user_avatar/forum.johnnydecimal.com/johnnydecimal/32/1759_2.png) [@johnnydecimal](https://forum.johnnydecimal.com/u/johnnydecimal)\
**Post date:** [June 16, 2024, 10:20pm UTC](https://forum.johnnydecimal.com/t/unclear-how-to-recognize-if-im-capturing-too-large-of-a-scope/1582/3 "2024-06-16T22:20:27Z")

</div>

The more of this I do, the more I tend towards fewer, broader _everything_.

This was the recent realisation.

> **[22.00.0050 Granularity of IDs](https://johnnydecimal.com/20-29-communication/22-blog/22.00.0050-granularity-of-ids/)**
>
> 'How big is an ID' is a common question; Lucy answered it differently than I would have, and I like what she did.

And if you scale that idea up to categories, areas, and your whole system, I think it applies.

This is _especially_ the case in a shared environment like work. There, there are even more opportunities for ambiguity because you’ve got 2+ human brains.

So give each of them as big a chance of finding the thing they’re after as you can. Do this by having fewer, broader things.

This will probably result in the over-loading of some IDs. You might end up with more subfolders in some of these IDs than you might like.

I think this is okay. I think getting the user to the place they need to be is the primary goal. That’s the problem you’re solving.

When they get there, if instead of 5 things there are 25, that’s okay. They’ll handle that, because that’s ‘normal’ anyway.

_And_ if you do this exercise and you really can’t get all of your areas in to one system, splitting them out to their own system shouldn’t be difficult. You should be designing your system to have isolated, contained areas anyway.

---

<div class="post-metadata">

**Author:** ![johnnydecimal](https://forum.johnnydecimal.com/user_avatar/forum.johnnydecimal.com/johnnydecimal/32/1759_2.png) [@johnnydecimal](https://forum.johnnydecimal.com/u/johnnydecimal)\
**Post date:** [June 16, 2024, 10:36pm UTC](https://forum.johnnydecimal.com/t/unclear-how-to-recognize-if-im-capturing-too-large-of-a-scope/1582/4 "2024-06-16T22:36:43Z")

</div>

Also: in this situation, having documented naming standards for the files in those subfolders will be _vital_.

You have to avoid them going back to chaos. Fortunately, this is easy! Date at the front in `yyyy-mm-dd` format. An agreed versioning standard. An `archive` folder that old stuff goes in.

The workbook (in the `60-69` area) has more on this. One of the things I want to create is a JD Operations Handbook for small business, it’d have this sort of detail but in a very process-driven way.

Let me know if you want a hand, it’ll incentivise me to write that thing.

---

<div class="post-metadata">

**Author:** ![\_FJ](https://forum.johnnydecimal.com/user_avatar/forum.johnnydecimal.com/_fj/32/420_2.png) [@\_FJ](https://forum.johnnydecimal.com/u/_FJ)\
**Post date:** [June 17, 2024, 6:54am UTC](https://forum.johnnydecimal.com/t/unclear-how-to-recognize-if-im-capturing-too-large-of-a-scope/1582/5 "2024-06-17T06:54:38Z")

</div>

@Mach3Maelstrom please share your progress as you go! Would love to see a company-wide system.